Electronics Cleanroom: 3,200 m² ISO Class 5 & Class 7 Facility

Engineered for microelectronics and optical sensor manufacturing: 720 high-efficiency EC Fan Filter Units (FFUs), computerized RS485 group speed control, dissipative ESD flooring, and integrated laminar flow clean workstations.

Project Scope & Micro-Contamination Challenges

A precision optical sensor and microelectronics manufacturer required a 3,200 m² clean fabrication plant. The facility encompasses an ISO Class 5 (Class 100) photolithography and wafer inspection suite, an ISO Class 6 SMT high-speed placement hall, and ISO Class 7/8 testing and packaging areas.

Stringent Manufacturing Tolerances: The client faced critical yield challenges: sub-micron dust particles causing short circuits on high-density circuits, electrostatic discharge (ESD) risks destroying sensitive MOSFET components, and thermal-induced structural warping requiring temperature precision within ±0.5°C and relative humidity within ±3%.

BESTCLEAN Modular FFU Engineering Architecture: Rather than relying on rigid, high-energy centralized ductwork, BESTCLEAN engineered a ceiling blind-plenum system utilizing 720 intelligent EC-motor FFUs. With 90% motor efficiency, ultra-low vibration (< 0.5 mm/s), and real-time RS485 bus control, each production zone can dynamically throttle air velocity between 0.35 and 0.50 m/s to conserve energy during non-operating hours.

TOTAL CLEAN FAB AREA
3,200 m²
MAXIMUM CLEANLINESS
ISO Class 5 (Class 100)
INSTALLED FFU UNITS
720 Sets (EC Motors)
STATIC DISSIPATION
1.0 × 10⁴ ~ 10⁶ Ω

Authentic Installation & Equipment Records (Semiconductor Fab)

All photographs captured on-site during installation, FFU commissioning, and clean bench integration:

Electronics Cleanroom Equipment & FFU Schedule (BOM)

System / Category Delivered Specification & Equipment Model Quantity Technical Standard & QA Verification
Fan Filter Units (FFU) BJ-FFU1175-EC with ultra-efficient EC motor and RS485 communication 720 sets 99.999% @ 0.12µm PTFE ULPA filter, vibration < 0.5 mm/s
Central FFU Group Controller 7-inch touch-screen central console with Modbus/RS485 multi-zone zoning 2 master units Independent speed stepping 0–100%, fault alarm feedback
Ceiling Grid Suspension Heavy-duty 55mm extruded aluminum cleanroom blind-plenum ceiling grid 3,200 m² Load capacity > 120 kg/m², earthquake resistant bracing
Laminar Flow Clean Benches BJ-SW-CJ series horizontal & vertical clean benches (SUS304 tabletop) 16 units Class 100 internal cleanliness, built-in ionizing anti-static bar
Personnel Air Showers BJ2000-D-QP SUS304 high-speed nozzle air shower with interlock doors 6 sets 25 m/s blast velocity, automatic infrared motion sensor start
Anti-Static Dissipative Floor 2.0mm conductive PVC tiles connected to copper grounding grid 3,200 m² Point-to-ground resistance 10⁴ – 10⁶ Ω (ASTM F150 / IEC 61340)

Energy Efficiency Architecture: 34% Lower Power Consumption

ENGINEERING PERFORMANCE INNOVATION

Why EC Motor FFUs Outperform Traditional Central AHUs in Electronics Fabs

Cleanrooms operating hundreds of motors 24/7/365 run high electricity bills. BESTCLEAN's electronic cleanroom design cut ongoing operational expenditure through three engineering choices:

  • EC Brushless DC Motors: Consumes 34% less electrical wattage than standard AC induction fans, generating 40% less rejected heat into the clean space, drastically reducing chiller load.
  • Zoned Sleep Mode: The central computerized console drops off-shift FFU air velocity from 0.45 m/s down to 0.25 m/s across idle lines while maintaining continuous positive pressure cascades.
  • Zero-Duct Static Pressure Loss: Blind-plenum circulation avoids hundreds of meters of high-friction sheet metal ducts, lowering required system fan total static pressure by 350 Pa.
  • Modular Expansion Capability: Future line modifications do not require tearing down ductwork; simply reposition or add FFUs in the ceiling grid within hours.

Designing an Electronics or Semiconductor Cleanroom?

Share your facility footprint and cleanliness class targets. Our HVAC and FFU engineers will configure your ceiling grid layout and budget within 24 hours.

Request FFU Layout & Quote WhatsApp FFU Engineer
💬 WhatsApp