ENGINEERING DOSSIER REF: BC-CASE-VN2025 ISO 8 / HACCP VALIDATED LOCATION: HAI DUONG, VIETNAM

Food Processing Cleanroom: Vietnam 2,800 m² Facility

Turnkey engineering delivery combining modular pre-engineered cleanroom panels, factory-direct purification AHUs, SUS304 personnel & cargo air showers, and senior engineer on-site supervisor dispatch.

Project Scope & Engineering Challenge

A major food export enterprise in Hai Duong, Vietnam required an immediate fit-out of a 2,800 m² facility conforming to international HACCP, ISO 22000, and US FDA environmental standards. The facility required 3 strict environmental zones: raw material prep (quasi-clean), continuous baking & cooling (Class 100,000 / ISO 8), and sterile inner packaging (Class 10,000 / ISO 7).

The Operational Bottleneck: Local Vietnamese engineering contractors quoted 6+ months for imported equipment with a 35% broker markup, but lacked in-house HVAC balancing expertise to guarantee positive differential pressure cascades (+15 Pa) against tropical high-humidity exterior air.

BESTCLEAN's Dual-Engine Solution: All core equipment (air showers, pass boxes, AHU coils, doors, panels) was pre-fabricated in our Zhangzhou mother plant in 18 days, shipped via Xiamen Port direct to Haiphong Port (5 days ocean freight), and assembled on-site under 2 senior dispatched BESTCLEAN project directors.

TOTAL FIT-OUT AREA
2,800 m²
CLEANLINESS CLASSIFICATION
ISO 8 & ISO 7
PRESSURE CASCADE
+15 Pa / +25 Pa
INSTALLATION TIMELINE
38 Working Days

Authentic Jobsite Installation Records (Hai Duong, Vietnam)

All photographs captured on-site during installation and final validation handover:

Equipment & Material Schedule (BOM Summary)

System / Category Delivered Specification & Equipment Model Quantity Fabrication & Verification Protocol
Envelope Wall Panels 50mm Rockwool Sandwich Panels (0.5mm PPGI skins, 120 kg/m³ core) 4,200 m² Class A fire rating, ISO 14644 tongue-and-groove joint
Cleanroom Doors & Windows SUS304 airtight flush single/double doors + flush double-glazed windows 48 sets doors / 62 windows Automatic drop-seal sweeps, 3A desiccant spacers
Personnel Air Showers BJ1400-D-QP-2 Two-person double blow SUS304 air showers 4 units 100% Testo anemometer calibrated to 22.5 m/s
Cargo Air Shower Tunnel BJ3000 Cargo Air Shower with high-speed PVC roll-up doors 2 suites Infrared sensor automated opening, 36 nozzles
Purification AHUs B-JZP15 Modular Cleanroom Air Handling Units (15,000 m³/h, 900 Pa) 6 sets Direct-expansion DX scroll condensing units, primary+medium filters
HEPA Terminal Outlets BJ-15IB Ceiling Diffusers with H13 Mini-Pleat Filters (99.99% @ 0.3µm) 180 sets Factory DOP aerosol leak scanned before packing

How We Executed in Vietnam: Delivery Model 02

MODEL 02 · ON-SITE SUPERVISION (SE ASIA PREFERRED)

2 Dispatched Senior Engineers + 24 Local Vietnamese Workers

Instead of hiring an expensive international construction firm or leaving local crews without guidance, BESTCLEAN dispatched 2 seasoned cleanroom project directors (1 HVAC commissioning specialist + 1 structural panel supervisor) to Hai Duong for 38 consecutive days:

  • Step 1 (Laser Leveling & Framing): Dispatched engineers mapped laser datum lines across the 2,800 m² floor, training local crews on clean joint sealing and ceiling threaded rod suspension.
  • Step 2 (Airtight Door & Pass Box Mounting): Direct supervision of 48 airtight door frames and drop seals to guarantee zero air bypass.
  • Step 3 (Duct Pressure & Leak Testing): Conducted light testing and pressure decay checks on all supply/return galvanized ductwork prior to ceiling close-in.
  • Step 4 (Balancing & Acceptance Handover): Tuned room airflow dampers and static pressure regulators using Testo anemometers, achieving +15 Pa / +25 Pa pressure cascades verified by third-party testing agency Quatest 1.

Planning a Food Cleanroom in Southeast Asia or Overseas?

Get a direct engineering review, architectural zoning layout, and factory-direct equipment quotation within 24 hours.

Request Project Proposal Live WhatsApp Review
💬 WhatsApp