REPLY < 24H MON–SAT · ISO 14644 · 200+ PROJECTS
info@bestcleanmfg.com  ·  WA +86 138 0000 0000  ·  EN · 中文 · VI · TH · MS · ES · RU
HOME / INDUSTRIES / COSMETICS CLEANROOM

Cosmetics Cleanrooms

Filling and packing suites that pass GMPC audit — and look good enough to show your brand clients on a factory tour.

ISO 22716GMPCCLASS 100K

Built for GMPC audits and brand-client tours

  • Class 100,000 (ISO 8) filling and inner-packing suites; Class 300K for compounding and support
  • ISO 22716 hygiene chain: SUS304 lockers with ozone sterilization, sensor sinks, air showers sized to shift changeovers
  • Water & air sanitation: ozone systems for process water loops and empty-room air cycles
  • Tour-ready finish: vision panels along visitor corridors — your cleanroom becomes a sales asset for brand audits
  • Fast changeovers: mobile purification AC options let refurbishments run without stopping filling lines
Get 48h Engineering Proposal
Cosmetics filling cleanroom production lineGMPC
Cosmetics Cleanroom equipment
Cosmetics Cleanroom equipment
Cosmetics Cleanroom equipment

Typical cosmetics facility map

AREACLASSKEY EQUIPMENT
Compounding300KPurification AC, ozone water dosing
Filling100K (ISO 8)HEPA outlets, pass boxes, AIS ionization
Inner packing100KAir shower, hygiene line
Outer packing / storeImpact doors, scheduled ozone

REFERENCE VALUES — FINAL DESIGN IS ENGINEERED TO YOUR PRODUCT AND AUDIT SCHEME.

Equipment for this industry — from our own line

See a comparable Class 100K build — 800 m², 32 days

Case Study

See a comparable Class 100K build — 800 m², 32 days

READ CASE →
BESTCLEAN chief engineer
CHIEF ENGINEER · 15 YRS · 200+ CLEANROOM PROJECTS

"Send me your floor plan. I'll tell you what it really costs."

Every proposal is reviewed by our chief engineer — not generated by a sales script.

Ask the Engineer

Frequently asked questions

What class does a cosmetics filling room need?

ISO 22716 practice puts filling and inner packing at Class 100,000 (ISO 8), compounding at Class 300K. We map your exact product risk in the 48h proposal.

Can the cleanroom double as a showcase for brand clients?

Yes — vision-panel corridors and tour routes are designed in from day one; several clients use their BESTCLEAN cleanroom as a sales tool.

Do you handle water sanitation too?

Yes — ozone dosing systems with venturi mixers for process-water loops are part of our standard scope.

Typical build time for a 500 m² suite?

Around 30-45 days on site after a 2-3 week prefabrication window, depending on HVAC scope.

Planning a cosmetics cleanroom?

Floor plan photo + industry + target class → layout, equipment list and budget in 48 hours. Free.

Start My Proposal
💬 WhatsApp